epoxy floor example projects
| 2700 | sqft | ||||||||
| Spread Rate per gal | |||||||||
| AD144 | colored | Primer | 270 | 10 | gals | ||||
| AD707 | colored | Build Coat | 140 | 19.5 | gals | ||||
| AD322 | clear | Top Coat | 360 | 7.5 | gals | ||||
| Chips | heavy flake | 100 | lbs | ||||||
| Make sure to ration chips appropriately. Break project down into 5 parts. Basically 5 2 car garages. | |||||||||
| You can still do it all at once but lay it out as though you are doing 5 equal parts. Use your saw | |||||||||
| cuts to break it down. Maybe more maybe less depending on your preference. But ration all | |||||||||
| material appropriate among the equal sections and make sure to use all the material you laid | |||||||||
| it out for. Do this for all large jobs to ensure the project was bid out appropriately and to ensure the | |||||||||
| customer is getting what they paid for in way of materials. | |||||||||